Hello

Last year I, with the help of two willing kind people, built a pond about 6 x 9 and 3 deep. I want to expand the pond, install better equipment and have a very small patio installed beside it. I received an estimate from a landscaper to make the pond 20 x 13 x 3 1/2 deep + patio. The estimate came to $15000. Does this seem high to anyone else ?

nibor

nibor
Reply With Quote
  #2  
Old 04-15-2008, 05:45 PM
hockeyref88's Avatar
hockeyref88 hockeyref88 is offline
 
Join Date: Mar 2008
Posts: 95
I am a General Contractor in So. California. If you are talking demo of old pond and building a new one, equipment and concrete included it sounds right in the ballpark to me.

Rick
Reply With Quote
  #3  
Old 04-16-2008, 04:30 PM
nibor nibor is offline
 
Join Date: Apr 2008
Posts: 15
No concrete involved just liner and not really a demo of old pond but an enlargement. Still in the right ballpark you think?
Reply With Quote
  #4  
Old 04-16-2008, 05:50 PM
hockeyref88's Avatar
hockeyref88 hockeyref88 is offline
 
Join Date: Mar 2008
Posts: 95
I have a couple of questions then. Where do you live? When you say patio, what do you mean? A covered area with no hardscape?? If you are enlarging your pond that much, you must be installing new equipment- pump/filter ect. Right??? Is that included?? If not that sounds a bit high. Where I live, my guys could dig that area out in a day. I'd have the pond up and running by the next day. That would not include planting and such but plumbing and liner in place and ready with water running. I would need more info on the patio to know if the price is right.

Rick
Reply With Quote
  #5  
Old 04-16-2008, 07:34 PM
nibor nibor is offline
 
Join Date: Apr 2008
Posts: 15
North Carolina. Patio = flagstones with soil between. Size approx. no more than 7 x 9 feet. Just enough for a wrought iron table and chairs. New equipment is necessary for sure. The landscaper said it would take a week. I thought that was a lot with the crew that he said he was assembling. In that it took my two pals and myself three days to dig the 6 x 9 pond and add water + plants in 3 days. And it was dug out with shovels, also in clay soil. By the way - I very much appreciate your take on this. There are other people to call in... but they have varied expertises... one stonescaping, one a plumber, but I want to do this right and not have to correct it later. I called some other pondscapers... but they did not show when they said they would... thus I get the feeling they are not very professional. Maybe I should just get out the shovels !!!
Reply With Quote
  #6  
Old 04-16-2008, 08:33 PM
hockeyref88's Avatar
hockeyref88 hockeyref88 is offline
 
Join Date: Mar 2008
Posts: 95
Have you got any pic's of your existing setup?? If it was me ( and I was not a contractor) I would maybe think about just hiring someone to either bring a backhoe or a crew of guy's over to do the dig, and then do the rest myself. Flagstone is cheap for your patio. Your liner probably about 4-6 hundred bucks for a 30'x25' min size. By your measurements I'm coming up with about 5600 gallons. You can buy the rest of the stuff online at good prices. Are you going with a sumerged pump? any kind of waterfall?? What is your filter setup going to be?? Just curious. I love this stuff
Reply With Quote
  #7  
Old 04-16-2008, 08:34 PM
DrCase's Avatar
DrCase DrCase is offline
 
Join Date: Dec 2007
Location: Arkansas
Posts: 378
tell me they are going to bring in a truck load of rocks , build a big waterfall nice stone around the pond , no liner showing, new eq. it sounds high in arkansas .
Reply With Quote
  #8  
Old 04-17-2008, 08:57 PM
DrDave's Avatar
DrDave DrDave is offline
Innovator
 
Join Date: Aug 2007
Location: Escondido, Ca USA
Posts: 701
I think Rick has hit it on the head. A picture is worth a thousand words and so far we have not seen more than a hundred.

I'm not a contractor, but I have done a lot of estimating. There are a lot of variables that cause the contractor time. You did your original build in 3 days but you had done a lot of research ahead of time. Time is money to them...

Any contractor will have to invest some time to get up to speed on your specific requirements. So while it may seem high, remember he has a family to feed and people to pay who also have families.

I would contract out only what you cannot do yourself. That may be just the digging and disposal of dirt if you are not going use it for a waterfall or surround.

Got Photos???
__________________
DrDave
Necessity is the Mother of Invention
http://drdaveskoi.tripod.com
http://plansbyjorde.tripod.com
May God bless all our troups in harm's way
Reply With Quote
  #9  
Old 04-21-2008, 12:49 PM
nibor nibor is offline
 
Join Date: Apr 2008
Posts: 15
I dug around and found some photos that were made last year just after the pond was finished. It is very much the same now minus the plants - as the garden is just coming back. Finally heard from the stonescaper - so I may get a different estimate. I looked into the prices of the pump and UV sterilizer and found them online for a third of estimate price. Curious.

http://www.flickr.com/people/19856045@N03/
Reply With Quote
  #10  
Old 04-21-2008, 02:47 PM
nibor nibor is offline
 
Join Date: Apr 2008
Posts: 15
Here is a link to photos that were made last summer.

http://www.flickr.com/photos/19856045@N03/

I posted this earlier - but it didn't show up. Must have his a wrong button.
Reply With Quote
Reply


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -4. The time now is 01:06 AM.


Powered by vBulletin
Copyright ©2000 - 2008, Jelsoft Enterprises Ltd.
2007 Garden Pond Forum