Hi there. I’m new to the forum and here’s why I joined.
About 35 years ago we purchased a historic home on the eastern shore of Maryland. My wife is a fantastic gardener so immediately got to work building what are now mature garden rooms.
She wanted a pond for goldfish and water plants so I dug a 12x6 pond with sloped sides. 2/3 of the pond is 4’ deep and 1/3 is about 1’ deep. That makes a nice shelf for potted water plants and the deep section was good enough to winter over fish for many years. I used a 30mil liner and put slate around the edge covering the liner.
Amazingly, it has held up well for these decades. There are a few small holes above the water line but all in all, not bad. Also, I framed the top perimeter with 4x4’s.
We have decided to rebuild and will pour a concrete bottom, block walls, expand the size slightly and make a more permanent fountain than we have currently. The sides will come up above grade 18”, veneered with brick, capped with bluestone with a bluestone patio on one side.
Unlike the first project, I have a contractor doing the concrete, block and stone work. I will take care of the block and concrete treatment. I have a few months to research before his schedule is clear to start so I will read and gather from the past posts and likely start a thread with some pics as we get started.
Looks like a ton of expertise is here on tap.
Jack
About 35 years ago we purchased a historic home on the eastern shore of Maryland. My wife is a fantastic gardener so immediately got to work building what are now mature garden rooms.
She wanted a pond for goldfish and water plants so I dug a 12x6 pond with sloped sides. 2/3 of the pond is 4’ deep and 1/3 is about 1’ deep. That makes a nice shelf for potted water plants and the deep section was good enough to winter over fish for many years. I used a 30mil liner and put slate around the edge covering the liner.
Amazingly, it has held up well for these decades. There are a few small holes above the water line but all in all, not bad. Also, I framed the top perimeter with 4x4’s.
We have decided to rebuild and will pour a concrete bottom, block walls, expand the size slightly and make a more permanent fountain than we have currently. The sides will come up above grade 18”, veneered with brick, capped with bluestone with a bluestone patio on one side.
Unlike the first project, I have a contractor doing the concrete, block and stone work. I will take care of the block and concrete treatment. I have a few months to research before his schedule is clear to start so I will read and gather from the past posts and likely start a thread with some pics as we get started.
Looks like a ton of expertise is here on tap.
Jack
