Okay first question. We have hard red clay that has been fun to dig in My problem is one edge of the pond is at a lower grade. I had planned to us the extra dirt to raise the lower end of the pond. I have tried placing boards on the edge and pack the dirt back behind it. Each time I move the board the dirt colapses back in? I have tried dry dirt and today it was damp. Thought that would pack better. I'm only going 10inchs at the lowest. Am I going to have to use thin boards and contour it to the edge and leave it?