So I have constructed Skippy filter and have everything to hook up my submersible pump.
I am going to place the filter behind a waterfall I am building.
I have a huge pile of earth and 10x10 liner and underlayment.
Now I know to tamp the earth and sculpt out hollows etc to which I will form the liner. And place rock
Once the liner is in place the earth below should be stable.
What I cannot figure out is what do I do about the ecposed earth on the back side of the waterfall?
If I have enough liner I could cover this area but if not do I build some sort of retaining wall to prevent erosion
I never gave thought to this before I ordered liner
What is proper procedure
I am going to place the filter behind a waterfall I am building.
I have a huge pile of earth and 10x10 liner and underlayment.
Now I know to tamp the earth and sculpt out hollows etc to which I will form the liner. And place rock
Once the liner is in place the earth below should be stable.
What I cannot figure out is what do I do about the ecposed earth on the back side of the waterfall?
If I have enough liner I could cover this area but if not do I build some sort of retaining wall to prevent erosion
I never gave thought to this before I ordered liner
What is proper procedure