- Joined
- Jun 8, 2020
- Messages
- 22
- Reaction score
- 16
- Country

The only ponds I have ever created are less than 20' wide and have EPDM liners to hold the water. These were successful and very enjoyable for all the wildlife activity that they create.
This time, I am interested in knowing if I can construct a pond without the use of a liner, as I have been told by neighbours to expect to see bears enjoying the new feature very soon after it is completed. The time, we will have the space to build a pond that can be larger and deeper. The location this time is going to be in the Asheville area of North Carolina.
Has anyone had experience with this type of pond project? The ideal would be that you excavate down far enough and discover the profile there naturally holds water. If not, I believe it requires bringing in clay for a new layer, and compacting it in place. I guess that would escalate the cost pretty quickly. I am curious to see what others have learned, including results of a soil test if they've gone down that road.
One ace in my back pocket, so to speak, is that we have an elderly excavator operator in our neighborhood. I have already hired him to do demo, and along with very fair pricing, he was just super easy to work with. This could be the next project for him and his 50 HP machine.
This time, I am interested in knowing if I can construct a pond without the use of a liner, as I have been told by neighbours to expect to see bears enjoying the new feature very soon after it is completed. The time, we will have the space to build a pond that can be larger and deeper. The location this time is going to be in the Asheville area of North Carolina.
Has anyone had experience with this type of pond project? The ideal would be that you excavate down far enough and discover the profile there naturally holds water. If not, I believe it requires bringing in clay for a new layer, and compacting it in place. I guess that would escalate the cost pretty quickly. I am curious to see what others have learned, including results of a soil test if they've gone down that road.
One ace in my back pocket, so to speak, is that we have an elderly excavator operator in our neighborhood. I have already hired him to do demo, and along with very fair pricing, he was just super easy to work with. This could be the next project for him and his 50 HP machine.