I'm new to this, here is my first pond! Also: Hi, I'm Jules from VT.

Joined
Sep 5, 2019
Messages
437
Reaction score
249
Location
S.E. Vermont
Hardiness Zone
5a
Country
United States
I've just finished building my first pond! I'm in Zone 5 in Southern Vermont. My pond is built into a steep hillside, and holds 65 gallons (but not 100% level so likely not holding that much in reality). At the top level, I have a small Danner Proline 1000 waterfall box which contains misc. biomedia and carbon which falls roughly a 1 foot drop into a 9g Maccourt connecting pool which I have altered into a waterfall pool which then drops a near 2 foot drop into a Maccourt 3-tier 5g cascade, which flows into the 65 gallon kidney-shaped pond (I purchased the pond locally and do not know the brand). It's driven by a Tetra Pond 1200gph pump with a Tetra box filter in the pond to which I have added filter floss and carbon to increase the ability to clear the somewhat muddy water due to the state of construction ongoing around the pond (and thunderstorm season). The pump is split between the falls (75-85%) and a small TotalPond fountainhead (15-25%) I rigged up on a valve with a tee splitter in the main pool. I've treated the water the same as my indoor aquarium, with beneficial bacteria (Seachem Stability) and Seachem Prime, though I doubt it's fully cycled at this point since I just added fish yesterday after doing a week of starting the biofilter. I've added no plants, but did dump some of my fancy guppies from my indoor aquarium in there, not expecting them to survive the winter, of course. I've just thrown an aquarium heater out there for now. They are not fish I care about, just ones I would give away for free anyway (which if anyone is interested in taking, can have).

Here's a video I made about a week ago when I was just finishing up setting the parts down, getting it running, and prior to getting the landscaping going: (it also has a bit of rambling at the end which sort of is a good intro to who I am and there's a bunch of photo comments which show the build process)
 

Attachments

  • new-pond.jpg
    new-pond.jpg
    306.6 KB · Views: 133
Joined
Sep 5, 2019
Messages
437
Reaction score
249
Location
S.E. Vermont
Hardiness Zone
5a
Country
United States
You've done a lot of work! Welcome to the GPF!

Thank you! Yes, the stone work is pretty heavy work. Digging the hole was no piece of cake either, but my wonderful partner was kind enough to bring the pick-axe and do the hardest of the work: getting through about 12 inches of hard-packed roots and gravel that were impenetrable with even the most rugged shovel.
 

Ask a Question

Want to reply to this thread or ask your own question?

You'll need to choose a username for the site, which only take a couple of moments. After that, you can post your question and our members will help you out.

Ask a Question

Members online

Forum statistics

Threads
31,472
Messages
517,358
Members
13,673
Latest member
Sodadispencer

Latest Threads

Top